Project: Pod various sites
Duration: 1 month
The Pod has been developed with Amiri Construction, it is a modular toilet pod which is built off site by the team this helps to reduce any programme problems as the pod is shipped to site complete. The pod once complete is transported to the required site & installation takes 2-4 hours. This benefits the main contractor as all they have to do is co-ordinate the utility services & the final connections
ParCar's installation included:
Mains distribution
Small power
Extract ventilation
|
|
Emergency lighting
Disabled toilet alarms
PIR controlled lighting to comply with Part L
|
Project: Southpoint, Ensign Way, Hamble
Duration: 6 months
Ensign way was a combination of office space & workshop space,
ParCar designed & installed all electrical aspects of this job.
ParCar's installation included:
3 phase mains distribution
Small power
Extract ventilation
Fire alarm
Emergency / escape lighting
|
|
Roller shutter door supplies
Disabled toilet alarms
Trade park general street lighting
PIR controlled lighting to comply with Part L
|
Project: Station Rd, Ash Vale
Duration: 5 months
Ash Vale was mostly workshop space with 3 units of office & workshop space.
ParCar designed & installed all electrical aspects of this job.
ParCars installation included:
3 phase mains distribution
Small power
Extract ventilation
Fire alarm
Emergency / escape lighting
|
|
Roller shutter door supplies
Disabled toilet alarms
Trade park general street lighting
PIR controlled lighting to comply with Part L
|
|